Power CABLEs are laid separately from communication and control CABLEs, or separated by other meansPrevents noise and faults in communication and control CABLEs caused by magnetic flux from power CABLEs
ProcessInstallation Process
01Material delivery and site survey
02Support fabrication and installation
03Tray fabrication and processing
04Tray seating and connection
05Special sections and accessories
06Grounding and final finishing
※ This page provides a general introduction to the product, and specifications and configurations are subject to change. Please contact us for the latest specifications and detailed application conditions.